This is a front view of the house taken on 9 May 2007. The outside lights have been installed on either side of the garage door.
This picture also shows the sidelight by the garage side door. On the floor inside the garage is stacked the tile to be used in the house.
The following pictures were taken on Monday, 7 May 2007. All the doors are in, the moulding is 99% complete. The septic tank was installed Monday morning before we arrived on site. The internal plumbing, sinks still have to be istalled and the house connected to the septic tank before everything is completed. The cabinet work is essentially completed. While we were there, the tile supply company delivered all of the tile and tile necessities. The carpet is supposed to be delivered this next Saturday and be installed soon after. The interior and exterior painting is also 99% completed. Next week, the driveway will also be poured along with any required sidewalks and concrete pads such as for the ac unit and the water tank.
Shown above is the the master bath vanity. Just to the left is a Jacuzzi style tub.
This view is in the Master Bedroom , the window to right looks out the front of the house. The ceilings in this area are 10 feet.
Master Bedroom again, both of these windows look out the east side of the house.
These are the fans the builder puts in the house. Our builder has put in much nicer furnishings than our last builder.
This is the chandelier in the dining area. All of the builder picks are brushed nickel.
Here it is, Maudie's masterpiece, the kitchen. This is the East side, the sink goes under kitchen window. She has picked a very large one hole sink tobe installed.
This is the West side of the kitchen. The big hole in the middle is for the refrigerator. The hole to the right is for the stove.
These cabinets are located between the refrigerator and the stove.
These cabinets will surround the stove.
Here is my GB making a final check with her paint chips. The builder will paint the whole inside white and then we will add colors of our choosing as soon as we can move in.
The counter tops are the centerpiece of her masterpiece. The bar was made with a different color than the counter top, just as she ordered.
Shown above is the the master bath vanity. Just to the left is a Jacuzzi style tub.
This view is in the Master Bedroom , the window to right looks out the front of the house. The ceilings in this area are 10 feet.
Master Bedroom again, both of these windows look out the east side of the house.
These are the fans the builder puts in the house. Our builder has put in much nicer furnishings than our last builder.
This is the chandelier in the dining area. All of the builder picks are brushed nickel.
Here it is, Maudie's masterpiece, the kitchen. This is the East side, the sink goes under kitchen window. She has picked a very large one hole sink tobe installed.
This is the West side of the kitchen. The big hole in the middle is for the refrigerator. The hole to the right is for the stove.
These cabinets are located between the refrigerator and the stove.
These cabinets will surround the stove.
Here is my GB making a final check with her paint chips. The builder will paint the whole inside white and then we will add colors of our choosing as soon as we can move in.
The counter tops are the centerpiece of her masterpiece. The bar was made with a different color than the counter top, just as she ordered.