
Well Headboard 4.0 didn't last long.

Chocolate cover removed and new cover awaiting installation.

Installing

The new cover.

Using the same cleat in the same location.

Cover installed.

Re-covering the buttons.

Each button has to be done.

The Nana in full swing.

Preparing the anchors for the buttons.

Re-covered buttons waiting to be installed.

Threading the buttons for installation.

Ready to hang.

Installed and on line; patiently waiting Headboard 4.2 or 5.0 whichever comes first.
No comments:
Post a Comment